Burlington DC Microgrid Blog 12: ARDA Power announces Phase 2 - an EV Charging DC Microgrid

12/27/2018

 

Read More

Burlington DC Microgrid Blog 11: ARDA's partners, current and prospective customers visit the site, witness off-grid operation in test mode

9/21/2017

 

Read More

Burlington DC Microgrid Blog 10: LED lights in testing mode

3/29/2017

 

Read More

Burlington DC Microgrid Blog 9: updated photo gallery of Gildemeister battery, Polar Power generator and the DC distribution panel

3/2/2017

 

Read More

Burlington DC Microgrid: RFI (Monitoring / SCADA system)

2/24/2017

 

Read More

Burlington DC Microgrid Blog 8: Installation of the Gildemeister flow battery - the CellCube is now home

2/14/2017

 

Read More

Burlington DC Microgrid Blog 7: fenced concrete pad for the Gildemeister battery and Polar Power gas generator

1/24/2017

 

Read More

Burlington DC Microgrid Blog 6: the 380VDC LED lighting is installed, Gildemeister Battery and Gas Generator concrete pad is ready

1/18/2017

 

Read More

Burlington DC Microgrid Blog 5: Gildemeister battery arrives, preparation for its installation is underway

12/21/2016

 

Read More

Burlington DC Microgrid Blog 4: Panasonic installed Solar

11/23/2016

 

Read More
<<Previous
    Burlington Blog
    or switch to:
    NEWS

    Archives

    December 2018
    September 2017
    March 2017
    February 2017
    January 2017
    December 2016
    November 2016
    May 2016
    March 2016

    RSS Feed

    Categories

    All


​​Copyright 2025 ARDA Power Inc.
ARDA Power logo