Burlington DC Microgrid Project
The world's first DC Microgrid in an industrial building (phase 1)
The Burlington DC Microgrid system powers select uninterruptible loads at the Head Office/North American manufacturing facility of Etratech (a Gentherm Company) in Burlington, Ontario.
|
Phase 1: First full deployment of ARDA’s Microgrid Solution in the C&I sector. Phase 2: World’s first EV Charging DC Microgrid, with lithium ion battery and solar upgrades.
|
The world's first EV Charging DC Microgrid (phase 2)
Key project assets include Solar PV, Natural Gas Generator, Battery Energy Storage, EV Fast Charger, and 380VDC LED lights.
|
The microgrid looks like a 15kW Load to the interconnected utility grid, and seamlessly operates during utility grid outages.
|